    Q & A


Software Q&A




General Questions

 
Does CivilTech software work for Windows Vista?
If you have USB version, it works with any new Windows operation system including Vista. If you have Code version, which is released several years ago, it may not work with Vista. You can update to our new USB key version. The USB key is a jump drive, which is standard USB equipment and always compatible with any future operation system.
05 Jun 2007 by James

Can I buy CivilTech Software from other place?
No! You should buy software only from CivilTech. Due to the popularity of our software, there are some groups that have tried to pirate our software and sell it. Not only are these copies illegal, but they will also provide erroneous results. CivilTech is not responsible for these copies. In addition, they cannot be upgraded and do not include technical support.
28 Apr 2005 by James

How do I know if there is an updated version of my software?
We post all the new updated version numbers in the Home page. If you find that your version is older than the version posted, you can download the new version from download page. Version numbers can be found in the Help/About menus in your program.
03 Feb 2005 by James

How do I get tech support as soon as possible?
Call us or E-mail your question or problem to technical support (In Home page, click Tech Support, find email or phone number)

Please provide the following:
1. Attach the relevant data file
2. Name and version of the software (Version can be found from Help/About in program)
3. Your company name and your name.
4. Your questions
03 Feb 2005 by James

An error is encountered in the program
E-mail your question or problem to technical support (In Home page, click Tech Support, find email)

Please provide the following:
1. Attach the relevant data file
2. Name and version of the software (Version can be found from Help/About in program)
3. Your company name and your name.
4. Your questions.
03 Feb 2005 by James

<< Previous 1 2 3 Next >>


AllPile Questions

 
How many piles per group can Allpile handle?
Almost an unlimited number of piles. For example, it can handle 100 piles in a group. But it should be an even number.
03 Oct 2004 by James

Can Allpile handle an odd number of piles such as 5, 7, or 9 piles?
Allpile can only handle an even number of piles, such as 2, 4, 6, 8, 10…but it can also handle 1 pile, and 3 piles.
03 Oct 2004 by James

How many layers of soil can I input?
Up to 10 layers of soil. If you have more than 10 layers of soil, you need to combine two or three similar layers to one layer.

Here are some examples: If you have the following layers:
2m thick with SPT=5, 3m thick with SPT=12, 1m thick with SPT=7.
You can combine them into one layer: 6m thick with SPT=(5x2+12x3+7x1)/6=8.8
03 Oct 2004 by James

<< Previous 1 2 Next >>


Shoring Questions

 
Why are the pressure diagrams different in Results and Diagram? (Shoring module)
The pressure diagrams in Diagram have multiplied by the spacing. It is a net pressure combined both active and passive pressure.
05 Jun 2007 by James

How can I see the shear, moment, and deflection data in the report? (Shoring module)
In page D, check Item 21 box, the shear, moment, and deflection data will be shown in the report. Uncheck the box to hide the data in the report.
05 Jun 2007 by James

If bedrock is uncounted at shallow depth, how can I make it work? (Shoring module)
In page D, Item 9, you can select the fixed embedment option and input a fixed embedment.
1. For cantilever wall: the system may be not stable. The pile may rotate at pile tip. Solution: Pile should penetrate the rock 2 to 3 feet, and use passive pressure = 5ksf to 10 ksf for bedrock. Select option 1.Yes, in Item 9 of page D.
2. For one-braced wall: the method above for cantilever wall can be used. (Select option 1.Yes, in Item 9 of page D). If you select option 3. Fixed in Item 9 of page D, the program will tell the F.S. of the system. If the F.S < 1, then friction at pile tip should be inputted (Item 11).
3. For multiple-braced wall: you can select option 3. Fixed in Item 9 of page D, the program can shift passive pressure to the last brace to satisfy the force and moment equilibriums.
05 Jun 2007 by James

In Shoring module, page B, pressure input, if I do not know the pile length, how can I input Z2 and P2 for a pressure? (Shoring module)
If you do not know the pile embedment, you can input Z2 = 800 for unknown depth. The program will calculate the pile embedment. P2 is inputted based on Z2 = 800 and pressure slope. If you have inputted slope of the pressure, P2 is automatically calculated by program. Please refer page B, Item 3.
05 Jun 2007 by James

What is purpose of the general module? (General module)
The general module does not do any calculation. It has the following functions:
1. Input some data once and send to each modules to save time
2. Change units and user’s information
3. Save project file for each modules (Optional)
05 Jun 2007 by James